bathroom remodel
The family room is complete (minus final decorating details) and the kitchen is 99% complete. The final tile work and the light rail for the under cabinet lightning will be installed this week. This weekend I began painting my bedroom, too. I settled on using "vintage linen" from Behr paint. This was after trying out patches of several shades of gray, "milk paint" blue, and green. The bathrooms are about halfway done at this point. Final cabinetry, flooring, lighting and plumbing still need to be installed. Here are some photos of the midway point. (The coloring is a bit off with my camera's shots.)
Bathroom #1:
Bathroom #2:
No comments:
Post a Comment